
Excavation to remove old footings ( a few large boulders).

Old footing

Framed and poured new footing with key-way and reinforcing rod

Some of the rot we removed (an oak 8x8 sill)

Interior Floor joist being installed after floor was totally removed

Treated plywood is placed in floor joist bays on top of strips. R-19 insulation is
to insulate the floor. New footing also visible.

Floor completely insulated and bridging nailed in place. Plywood subfloor
is then glued and nailed, finishing the rough floor.

Interior ceiling and ceiling joists to be removed and replaced with new joists
and finished sheetrock.

Jack posts in place while new double 2x8 floor joists are installed.

Doubled ceiling joist with construction adhesive ready to be fastened in place
Ceiling is strapped and sheetrock is installed.

Finished interior

This two story porch was also built by us on the same house in previous years.